Smooth Rail Transit

STARKON’s STS Crane rail team performed an inspection on an STS crane after reports were received that the trolley was vibrating. During the inspection, several items were identified as being the cause of the vibration. STARKON was challenged to stop the vibration.

The solution

  • We supplied the parts required. All were made in-house such as the trolley rail, transit and underlayment material, rail clips, and the trolley’s bushings.
  • We replaced the shortrails of the transit as well as the worn-out parts of the trolley rail.
  • We adjusted the complete rail length rail span.
  • We replaced several rail clips and the underlayment material.
  • We aligned the trolley wheels and guide rollers.

STARKON again (over 30 replacements have already been performed by STARKON) achieved a perfect rail transit and a smooth trolley operation. This increases the comfort of the operator, extends the life of the components, and increases productivity.

We are always available to explain the solutions that we provide. For any particular problem causing operational issues or delays and which requires urgent action, please feel free to contact us at any time.

Share this