August 2018

Load pins replacement

Tandem Lift ZPMC STS Crane
Starkon
CALL ME BACK

Repairs

The challenge

Ensuring the safe working conditions of the crane. A good, working overload protection is a must. All load pins of the Tandem Lift STS Cranes needed to be replaced to apply to the latest regulations.

The solution

STARKON supplied the specialized tools, method statement, and workforce to perform the job.

The result

All eight load pins on each of the cranes were replaced and successfully tested.

Download Download File
Load pins replacement
Size: 583.10 KB
Share this

Contact Us

We are always available to explain the solutions that we provide. For any particular problem causing operational issues or delays and which requires urgent action, please feel free to contact us at any time.

+31 (0)187 665 122
Job Application

How can we help you?

  • This field is for validation purposes and should be left unchanged.